Getting there
Cokato to Orono is about 35 miles east on Highway 12, which passes through the city. We are often here on the way to or from Wayzata, which makes small jobs like a repair or a buff and coat easier to fit in than they would be for a shop farther away.
Lake lots around Crystal Bay and Stubbs Bay, old and new
The shoreline in Orono is a mix. Some stretches have turned over to large new homes with walls of glass toward the water. Others still hold the 1960s and 1970s ramblers and the 1980s and 1990s two-stories that went up when lake lots cost less. Those two kinds of houses ask for different things from us. The new builds are wide plank white oak, usually engineered over in-floor radiant heat and finished on site so the color matches the cabinets and the stair. Big Island sits in the view from a lot of these great rooms, which means a lot of west- and south-facing glass and a lot of direct sun on the floor. We bring that up before the stain is chosen, because a dark floor under that much light will show every rug outline within a year. The older houses tend to have 2 1/4 inch red oak strip, sometimes maple, often under carpet. Many have been refinished once already, decades ago. We check the thickness above the tongue before we promise another full sand. A floor with a solid 1/8 inch left is fine. One that has already been sanded close to the tongue gets a buff and coat instead, or a careful light sand with a fine grit, and we say so before the job starts.
Humidity, winter heat and the lake
Orono houses see the same swing every house in Minnesota does. Forced-air heat drives indoor humidity below 25 percent in January, and a solid oak floor shrinks until the gaps between boards show. Summer brings the moisture back and the gaps close. The difference near the lake is that a lot of these homes have walkout lower levels, and some sit low enough that the lower level runs damp in a wet spring. Solid wood down there is a mistake. Engineered flooring on the lower level and solid or engineered on the main floor is the usual split, and we size the expansion gaps for the Minnesota range, not a national average. Acclimation matters more on a lake lot than it does inland. We deliver the flooring after the house is closed in and the heat is running, let it sit in the rooms where it will be installed, and check moisture content in the wood and the subfloor before the first board goes down.
What we do most in Orono
New-construction installs for builders working the shoreline, full refinishes of original oak in older homes, and water-damage repairs after a winter ice dam or a lower-level leak. The repairs are a bigger share here than in cities away from the lake. We cut out the cupped section and dry the subfloor, then lace in new boards and refinish so the patch disappears. Where the whole floor has been under water, we talk about replacement rather than pretending a sand will save it.
Refinishing hardwood floors in Orono
If the oak in your Orono house is original and tired, start with our hardwood floor refinishing page. It walks through the thickness check, the stain choices and the schedule, and most Orono refinishes follow that process exactly. How a refinish runs, start to finish.
Around Orono
- Lake Minnetonka
- Big Island
- Crystal Bay
- Stubbs Bay
- Highway 12
Hardwood services we bring to Orono
- Floor refinishing
- New Construction Flooring
- Engineered Hardwood Install
- Floor Installation
- Water damage repair
- Buff and coat
Every hardwood service, on one page.
Questions from Orono homeowners
Our Orono house is from 1968 and the oak has been refinished once. Can it take another sanding?
Probably, and we can tell you for certain in ten minutes. A 3/4 inch strip floor starts with about a quarter inch above the tongue, and each full sand takes some off. We check at a floor register or a threshold, measure what is left, and recommend a full sand, a light sand or a buff and coat from that.
Can you put hardwood in our walkout lower level?
Engineered hardwood, yes. Solid wood below grade is a bad bet on a lake lot because the slab and the air down there carry more moisture than the main floor. Engineered planks with a plywood core handle it, and they come in the same white oak faces and widths as the floor upstairs, so the two levels match.
Our builder wants the floor in next month. Can you hold the date?
Yes, that is how we work with builders. We book the install week into the construction schedule, confirm with the site super as it gets close, and if drywall or paint runs late we shift. The house needs to be closed in with the heat running first so the wood can acclimate before we lay it.
An ice dam leaked onto our floor last winter and some boards cupped. Do we replace the whole room?
Not usually. If the subfloor has dried and the cupping is limited to a few feet, we cut out the affected boards, lace new ones into the existing floor and refinish the room so the repair blends. Replacement makes sense only when water sat long enough to soak the subfloor or warp most of the field.
Nearby
We also work in Wayzata and Plymouth. Everywhere we work.